60 Social Housing Apartments in Rive-De-Gier / Tectoniques Architects
Our experience
Architects: Tectoniques Architects
Location: 42800 Rive-de-Gier, France
Area: 4160.0 sqm
Project Year: 2016
Fluids Engineering: Tectoniques Ingénieurs
Environmental Engineering: ARCOBA
Main Contractor : OSSABOIS
Project Management: : VOXOA
Building Control: VERITAS
Health And Safety Coordination: ALPES CONTROLES
Client: Immobilière Rhône-Alpes (groupe 3F)
Our experience The Tectoniques agency has extensive experience in building housing in eco-neighbourhoods, with a committed and ambitious environmental approach, using a specific construction protocol based on dry construction mainly using prefabricated wood components. The Rive de Gier project takes this basic approach to new heights. The entire programme, composed of individual grouped accommodation units, intermediate housing and small collective housing blocks, is entirely built using dry construction methods employing 2D macro-components along with 3D modules for the sanitary and technical facilities. This construction method developed by Ossabois is known as the "5D process".
A challenge in both urban and landscaping terms The project site is located at the heart of an existing urban network complete with the surrounding landsca...
Architects: Tectoniques Architects
Location: 42800 Rive-de-Gier, France
Area: 4160.0 sqm
Project Year: 2016
Fluids Engineering: Tectoniques Ingénieurs
Environmental Engineering: ARCOBA
Main Contractor : OSSABOIS
Project Management: : VOXOA
Building Control: VERITAS
Health And Safety Coordination: ALPES CONTROLES
Client: Immobilière Rhône-Alpes (groupe 3F)
Our experience The Tectoniques agency has extensive experience in building housing in eco-neighbourhoods, with a committed and ambitious environmental approach, using a specific construction protocol based on dry construction mainly using prefabricated wood components. The Rive de Gier project takes this basic approach to new heights. The entire programme, composed of individual grouped accommodation units, intermediate housing and small collective housing blocks, is entirely built using dry construction methods employing 2D macro-components along with 3D modules for the sanitary and technical facilities. This construction method developed by Ossabois is known as the "5D process".
A challenge in both urban and landscaping terms The project site is located at the heart of an existing urban network complete with the surrounding landsca...
| -------------------------------- |
| Dezeen at IKEA Festival: Form Us With Love unveils sustainable collaboration on day three |
|
|
Villa M by Pierattelli Architetture Modernizes 1950s Florence Estate
31-10-2024 07:22 - (
Architecture )
Kent Avenue Penthouse Merges Industrial and Minimalist Styles
31-10-2024 07:22 - (
Architecture )