Avalon House / ArchiBlox
Beyond ArchiBlox?s speedy construction time of 6 weeks, prefab suited the clients desire to tread lightly on the land with the Avalon House project.
© Michael Wickham
Architects: ArchiBlox
Location: Avalon Beach NSW 2107, Australia
Area: 106.0 sqm
Project Year: 2015
Photographs: Michael Wickham, Tom Ross
© Michael Wickham
From the architect. Beyond ArchiBlox?s speedy construction time of 6 weeks, prefab suited the clients desire to tread lightly on the land with the Avalon House project.
© Tom Ross
With modular building the impact on the surrounding environment is heavily reduced during construction. The dwelling is outfitted with a number of green features, including a living roof that minimises rainwater runoff and solar penetration. The green roof also acts as a thermal mass, an east-west orientation that allows cross-ventilation.
© Michael Wickham
Avalon House is beautifully wrapped in FSC certified external blackbutt hardwood timber milled from sustainably forestry methods. By fabricating off-site, ArchiBlox also had careful control over material usage with minimal wastage.
Floor Plan
As with any buildings procurement, it's not so much about the construction methodology that would affect the relationship with sustainability but more the direction of the archi...
© Michael Wickham
Architects: ArchiBlox
Location: Avalon Beach NSW 2107, Australia
Area: 106.0 sqm
Project Year: 2015
Photographs: Michael Wickham, Tom Ross
© Michael Wickham
From the architect. Beyond ArchiBlox?s speedy construction time of 6 weeks, prefab suited the clients desire to tread lightly on the land with the Avalon House project.
© Tom Ross
With modular building the impact on the surrounding environment is heavily reduced during construction. The dwelling is outfitted with a number of green features, including a living roof that minimises rainwater runoff and solar penetration. The green roof also acts as a thermal mass, an east-west orientation that allows cross-ventilation.
© Michael Wickham
Avalon House is beautifully wrapped in FSC certified external blackbutt hardwood timber milled from sustainably forestry methods. By fabricating off-site, ArchiBlox also had careful control over material usage with minimal wastage.
Floor Plan
As with any buildings procurement, it's not so much about the construction methodology that would affect the relationship with sustainability but more the direction of the archi...
| -------------------------------- |
| HIERRO CORRUGADO. Vocabulario arquitectónico. |
|
|
Villa M by Pierattelli Architetture Modernizes 1950s Florence Estate
31-10-2024 07:22 - (
Architecture )
Kent Avenue Penthouse Merges Industrial and Minimalist Styles
31-10-2024 07:22 - (
Architecture )
