Bruye?re High School Cafeteria Refurbishment / SAM Architecture
La Bruyère high school is composed of four buildings erected at different times. The school canteen was achieved in 1980 as an extension of the historical building constructed at the end of the nineteenth century. As the high school is built on a steep slope site, the canteen is half buried and enlightened only by zenithal openings.Â
© Charly Broyez
Architects: SAM Architecture
Location: 31 Avenue de Paris, 78000 Versailles, France
Architect In Charge: Boris Schneider, Guillaume Picard, Aure?lien Clovis?
Area: 1528.0 sqm
Project Year: 2015
Photographs: Charly Broyez
Structure And Hbac: Mizrahi
Industrial Kitchen Design Office: Process Cuisine
Construction Firms: SNRB (general contractor)
Me?talobil : carpentry
Ragueneau: kitchen equipment
Illico : modular construction
© Charly Broyez
La Bruyère high school is composed of four buildings erected at different times. The school canteen was achieved in 1980 as an extension of the historical building constructed at the end of the nineteenth century. As the high school is built on a steep slope site, the canteen is half buried and enlightened only by zenithal openings.Â
© Charly Broyez
The purpose of the operation is the kitchen?s upgrading, the creation o...
© Charly Broyez
Architects: SAM Architecture
Location: 31 Avenue de Paris, 78000 Versailles, France
Architect In Charge: Boris Schneider, Guillaume Picard, Aure?lien Clovis?
Area: 1528.0 sqm
Project Year: 2015
Photographs: Charly Broyez
Structure And Hbac: Mizrahi
Industrial Kitchen Design Office: Process Cuisine
Construction Firms: SNRB (general contractor)
Me?talobil : carpentry
Ragueneau: kitchen equipment
Illico : modular construction
© Charly Broyez
La Bruyère high school is composed of four buildings erected at different times. The school canteen was achieved in 1980 as an extension of the historical building constructed at the end of the nineteenth century. As the high school is built on a steep slope site, the canteen is half buried and enlightened only by zenithal openings.Â
© Charly Broyez
The purpose of the operation is the kitchen?s upgrading, the creation o...
| -------------------------------- |
| Atelier Bow-Wow's 2021 Royal Academy annual architecture lecture | Talks | Dezeen |
|
|
Villa M by Pierattelli Architetture Modernizes 1950s Florence Estate
31-10-2024 07:22 - (
Architecture )
Kent Avenue Penthouse Merges Industrial and Minimalist Styles
31-10-2024 07:22 - (
Architecture )