Esteve Albert High Scool / Estudi Nao + José MarÃa Gutiérrez
HORIZONTALITY. The building is aligned to the road and sits on the ground establishing a uniform horizontal line on top. A reference line in the landscape in contrast to the topography.
© José Hevia
Architects: Estudi Nao + José MarÃa Gutiérrez
Location: Sant Vicenç de Montalt, Barcelona, Spain
Architect In Charge: Estudi Nao (Francesc Puig, Anna Fumadó) + Jose MarÃa Gutiérrez
Area: 4650.0 sqm
Project Year: 2015
Photographs: José Hevia
Structural Engineering: Aquilue- Serrat
Mep Engineering: PGI engineering
Client: Infraestructures de la Generalitat SAU
Contractor: UTE Benito Arnó + Euroconstruct
Site Archutects: Josep Maria oller, Virginia Otal
© José Hevia
HORIZONTALITY. The building is aligned to the road and sits on the ground establishing a uniform horizontal line on top. A reference line in the landscape in contrast to the topography.
© José Hevia
GRADIENT. The building solves the difference in elevation between the road and the plot thanks to a half-buried floor which provides a direct relationship with the playground. At this level there is located the gym, locker rooms and services. A longitudinal porch provides a shelter and shade, and also connects the different parts of the building ...
© José Hevia
Architects: Estudi Nao + José MarÃa Gutiérrez
Location: Sant Vicenç de Montalt, Barcelona, Spain
Architect In Charge: Estudi Nao (Francesc Puig, Anna Fumadó) + Jose MarÃa Gutiérrez
Area: 4650.0 sqm
Project Year: 2015
Photographs: José Hevia
Structural Engineering: Aquilue- Serrat
Mep Engineering: PGI engineering
Client: Infraestructures de la Generalitat SAU
Contractor: UTE Benito Arnó + Euroconstruct
Site Archutects: Josep Maria oller, Virginia Otal
© José Hevia
HORIZONTALITY. The building is aligned to the road and sits on the ground establishing a uniform horizontal line on top. A reference line in the landscape in contrast to the topography.
© José Hevia
GRADIENT. The building solves the difference in elevation between the road and the plot thanks to a half-buried floor which provides a direct relationship with the playground. At this level there is located the gym, locker rooms and services. A longitudinal porch provides a shelter and shade, and also connects the different parts of the building ...
| -------------------------------- |
| Athletes attempt to break two-hour marathon barrier wearing custom-engineered Nike trainers |
|
|
Villa M by Pierattelli Architetture Modernizes 1950s Florence Estate
31-10-2024 07:22 - (
Architecture )
Kent Avenue Penthouse Merges Industrial and Minimalist Styles
31-10-2024 07:22 - (
Architecture )
