Jey Official Building / Sarsayeh Architectural Office
This project referred to our office when its structure was totally built. And according to client?s demand the ground and basement floor were assigened as commercial spaces and every other levels designed as official saloons with enough flexibility to be divided into different patterns.Â
© Farshid Nasrabadi
Architects: Sarsayeh Architectural Office
Location: Isfahan, Isfahan Province, Iran
Area: 1100.0 sqm
Project Year: 2016
Photographs: Farshid Nasrabadi
Lead Architect: Behnam Sefidi
Design Assist: Hengameh Akbari
Contractor: Farhad Bahramipour
Client : Javad Shakeri
© Farshid Nasrabadi
This project referred to our office when its structure was totally built. And according to client?s demand the ground and basement floor were assigened as commercial spaces and every other levels designed as official saloons with enough flexibility to be divided into different patterns.Â
© Farshid Nasrabadi
After visiting the project site one point attracted all attentions and it was the constant green line of trees across the street that they were hiding the most part of all neighbor buildings façade behind itself. But because of our building extreme height it was appearing as a disharmonious spot across the street and tr...
© Farshid Nasrabadi
Architects: Sarsayeh Architectural Office
Location: Isfahan, Isfahan Province, Iran
Area: 1100.0 sqm
Project Year: 2016
Photographs: Farshid Nasrabadi
Lead Architect: Behnam Sefidi
Design Assist: Hengameh Akbari
Contractor: Farhad Bahramipour
Client : Javad Shakeri
© Farshid Nasrabadi
This project referred to our office when its structure was totally built. And according to client?s demand the ground and basement floor were assigened as commercial spaces and every other levels designed as official saloons with enough flexibility to be divided into different patterns.Â
© Farshid Nasrabadi
After visiting the project site one point attracted all attentions and it was the constant green line of trees across the street that they were hiding the most part of all neighbor buildings façade behind itself. But because of our building extreme height it was appearing as a disharmonious spot across the street and tr...
| -------------------------------- |
| CONTRATO DE OBRA CIVIL. |
|
|
Villa M by Pierattelli Architetture Modernizes 1950s Florence Estate
31-10-2024 07:22 - (
Architecture )
Kent Avenue Penthouse Merges Industrial and Minimalist Styles
31-10-2024 07:22 - (
Architecture )
