Olympic Field Hockey Center / Vigliecca & Associados
The Olympic Field Hockey Centre consists of two arenas, a warm-up field and a building with changing rooms, a medical center and an administrative office. This building is connected to both arenas through a marquee that also links them to each other.
© Leonardo Finotti
Architects: Vigliecca & Associados
Location: Rio de Janeiro, Rio de Janeiro, Brasil
Project Year: 2016
Photographs: Leonardo Finotti, Courtesy of Divulgação Ministério do Esporte
Olympic Sport: Hockey
Built Area: 4.000,00 m²
Intervention Area: 74.000,00 m²
Capacity: 11.900
Permanent Seats: 2.500
Temporary Seats: 9.400
Courtesy of Divulgação Ministério do Esporte
The Olympic Field Hockey Centre consists of two arenas, a warm-up field and a building with changing rooms, a medical center and an administrative office. This building is connected to both arenas through a marquee that also links them to each other.
Site Plan
Diagram (Portuguese)
The main arena has 2.500 permanent and 5.300 temporary seats totaling 7.800 seats. The last seating rows are the ones that will be kept in the legacy project. These seats were boldly designed since they face the North sector entry of the Deodoro Complex. Meanwhile, the second arena does not have pe...
© Leonardo Finotti
Architects: Vigliecca & Associados
Location: Rio de Janeiro, Rio de Janeiro, Brasil
Project Year: 2016
Photographs: Leonardo Finotti, Courtesy of Divulgação Ministério do Esporte
Olympic Sport: Hockey
Built Area: 4.000,00 m²
Intervention Area: 74.000,00 m²
Capacity: 11.900
Permanent Seats: 2.500
Temporary Seats: 9.400
Courtesy of Divulgação Ministério do Esporte
The Olympic Field Hockey Centre consists of two arenas, a warm-up field and a building with changing rooms, a medical center and an administrative office. This building is connected to both arenas through a marquee that also links them to each other.
Site Plan
Diagram (Portuguese)
The main arena has 2.500 permanent and 5.300 temporary seats totaling 7.800 seats. The last seating rows are the ones that will be kept in the legacy project. These seats were boldly designed since they face the North sector entry of the Deodoro Complex. Meanwhile, the second arena does not have pe...
| -------------------------------- |
| Dancers perform vertical routine across Boston building facade |
|
|
Villa M by Pierattelli Architetture Modernizes 1950s Florence Estate
31-10-2024 07:22 - (
Architecture )
Kent Avenue Penthouse Merges Industrial and Minimalist Styles
31-10-2024 07:22 - (
Architecture )
