Zebrano / Plan b arquitectos + M+Group
1. Adaptability to the sun
© Alejandro Arango
Architects: Plan b arquitectos , M+Group
Location: Envigado, Envigado, Antioquia, Colombia
Project Team: Juan Camilo Garcés, MarÃa Clara Osorio, Carlos Blanco, Daniel Tobón, Esteban Hincapié, Santiago Mora
Project Year: 2016
Photographs: Alejandro Arango, Vásquez Villegas FotografÃa
Ecosystem: Bosque montano, Montaneforest
Project Managment: Felipe Mesa, Federico Mesa, Andrés Felipe Mesa Trujillo
Constructor: RÃos Constructores
Client: RÃos Constructores
© Alejandro Arango
From the architect. 1. Adaptability to the sunThis building settles in plan to an irregular and tight plot which imposes its perimeter shape. For a better adjustment, the program is fragmented in to two big apartments in each level, leaving in the middle a long shaped hall which allows to change the direction, turning to find the most favorable position obeying simultaneously with a strict urban regulation regarding the setbacks and visual control towards other buildings. Its shape is also the shape of the plot.
2. ProgramIn section the building adapts to the high inclination of the plot, leaving the main access at street level, 4 inferior levels for parking, 13 above levels of apartments and a final level with a ter...
© Alejandro Arango
Architects: Plan b arquitectos , M+Group
Location: Envigado, Envigado, Antioquia, Colombia
Project Team: Juan Camilo Garcés, MarÃa Clara Osorio, Carlos Blanco, Daniel Tobón, Esteban Hincapié, Santiago Mora
Project Year: 2016
Photographs: Alejandro Arango, Vásquez Villegas FotografÃa
Ecosystem: Bosque montano, Montaneforest
Project Managment: Felipe Mesa, Federico Mesa, Andrés Felipe Mesa Trujillo
Constructor: RÃos Constructores
Client: RÃos Constructores
© Alejandro Arango
From the architect. 1. Adaptability to the sunThis building settles in plan to an irregular and tight plot which imposes its perimeter shape. For a better adjustment, the program is fragmented in to two big apartments in each level, leaving in the middle a long shaped hall which allows to change the direction, turning to find the most favorable position obeying simultaneously with a strict urban regulation regarding the setbacks and visual control towards other buildings. Its shape is also the shape of the plot.
2. ProgramIn section the building adapts to the high inclination of the plot, leaving the main access at street level, 4 inferior levels for parking, 13 above levels of apartments and a final level with a ter...
-------------------------------- |